(360) 369-0936Get my estimate
Guide

The best time to install permanent lighting: why fall books out and January through March is the deal

Everyone decides they want permanent lighting in the same six weeks, between the first cold night in October and Thanksgiving. What that does to the calendar, what the weather does to the install, and when the smart money books:

Gloved hands holding a tape measure along a fascia board from a ladder
The measure: every run taped, drip edge tested with a magnet (illustration).

Plan ahead of the season

Allow time for a measure, product selection, any HOA review and suitable installation weather. Ask for current availability and confirm your installation date in writing. This site does not promise a response deadline or pre-Thanksgiving installation.

November: real slot dates, not promises

By the first week of November we're quoting specific install days rather than lead times. Rain becomes the constraint; VHB needs a dry surface above about 50°F, so bonding happens on dry mornings and a job sometimes splits into two short visits. Ask which dates are open when you book; the install date is confirmed with your quote.

Seasonal C9 service exists for exactly this month. If the permanent calendar is full, seasonal Christmas light installation gets the house lit for the season and you can compare a permanent system for future year-round use.

December: lit by the parade

The Christmas Ships pass the Vancouver waterfront on December 3, 11 and 16 this year and Camas and Washougal on December 5; Camas Hometown Holidays is December 4 and Battle Ground's tree lighting the same night. Installs continue through mid-December as weather allows; after that we're into off-season work.

January through March: the deal

The calendar is open, the crew wants the days, and dry, cold mornings above 50°F are common enough to bond on. It is the easiest time of year to get the exact day you want, and the best time to ask for a sharper number on a large job. It's also when HOA committees have the shortest queue.

The lights are on the house for Valentine's, St. Patrick's, Easter and the Fourth, and a full year of warm white before next Christmas.

Spring and summer: architectural lighting season

Owners who buy in spring usually aren't thinking about Christmas at all. They want the warm-white eave line for patio season and the game-day scenes for fall. Fascia is dry, days are long, and the install is at its easiest. Trees are wrapped in full leaf, which is a nicer way to see the result than a bare maple in November.

BOOK A FREE ESTIMATE

One moment…

Checking availability.

Packages mentioned

  • Pebble Track — Small dome lights in a color-matched channel. Warm white for every evening, color for special occasions.
  • Diamond Tree Wrap — 360-degree diamond lights spiraled up trunks and branches.

Priced by the foot · No hidden fees

Read next

Questions this guide gets

Can you install in the rain?
Lighting and controller work, yes. Channel bonding needs a dry surface above about 50°F, so we schedule it for dry hours and sometimes split a winter install into two visits at no extra cost.
Is there really an off-season price?
January through March is when we have the most room on large jobs. Ask for the off-season number when you book; we'll put it on the quote.
How late can I book for Christmas?
Ask about available dates before booking. A date is confirmed with the quote, not by a general deadline on this page.

Get the exact number

The free measure confirms the lighting layout, access and mounting, and gives you an exact written quote.

Vancouver & Portland homeowners

Up to $500 offyour lighting installation

See if you qualify. It takes 20 seconds, with no obligation.

Call or text us and mention this offer:

Call (360) 369-0936Text us